RailTel Bags ₹ 210.7 Crore Order For Udhampur-Srinagar-Baramulla Rail Project

Avatar of Rachna
RailTel Bags ₹ 210.7 Crore Order For Udhampur-Srinagar-Baramulla Rail Project

The contract has been awarded to RailTel by the IRCON International Limited, which is another PSU under the Railway Ministry

Indian Railways’ PSU RailTel Corporation has received a ₹ 210.7 crore contract to install an integrated tunnel communication system in Dharam-Banihal section of the ongoing Jammu and Kashmir (J&K) rail link project.

The contract will include works on design, supply, testing and commissioning of the tunnel communication system, comprising emergency call and service telephone, CCTV, tunnel radio, and public announcement system in the tunnel environment, according to RailTel’s statement today.

The contract has been awarded to RailTel by the IRCON International Limited, which is another PSU under the Ministry of Railways. IRCON is constructing the railway line in Dharam-Banihal section of the rail link project.

The Jammu and Kashmir rail link project – popularly known as USBRL (Udhampur -Srinagar -Baramulla rail link) is a 272 km-long railway line and is being built as a national project. The sections from Jammu to Katra and Banihal to Baramulla have been built and are currently operational.

The remaining track from Katra to Banihal is under-construction and is targeted for completion by next year, RailTel said.

Total
0
Shares
Leave a Reply
Previous Post
Rakesh Jhunjhunwala-Backed Star Health Shares Debut At 6% Discount

Rakesh Jhunjhunwala-Backed Star Health Shares Debut At 6% Discount

Next Post
FOUR COUNTRIES SCRAP THEIR CLUSTER BOMBS

FOUR COUNTRIES SCRAP THEIR CLUSTER BOMBS

Related Posts
Outfit Ideas for Girls Best Street Foods in Chennai Apart from Idli Dosa Laddu Gopal Winter Dresses Kalibadis to Visit in Delhi this Durga Puja Sawan Mehndi Design